08/01/2016
posted Friday 01, 2016, 2:43 PM by Elliott Sheerin
This week I have been really busy
9/10/2015
posted Friday 09, 2015, 3:07 PM by Elliott Sheerin.
This week has been quite good. We have had a Building Services Engineer, which helped us do anything to do with heating, water, electricity. We have also had open evening where we looked around the school for different courses and there is a Level 3 engineering course which I am putting in consideration.
2/10/2015
posted Friday 02, 2015, 14:43 PM by Elliott Sheerin
This week we have done mostly course work, but because of the extension of the competition we only dedicated one lesson to the competition. We have accelerated through the Revit models and website work. Next week i won't to get my building mostly done because I am falling behind on it.
25/09/2015
posted Friday 25, 2015, 14:50 PM by Elliott Sheerin
This week has been active on the course work because some of us are behind and need to catch up... I need to catch up on the Revit side of stuff, e.g. Do the furniture and finish the roof and stuff. Also we have been doing some of the competition, but the good news is that the dead line has been moved up to February because the dead line before was too short to do all the stuff we need.
10/07/2015
posted Friday 10, 2015, 10:04 AM by Elliott Sheerin
its been a stress full week getting back on track! Sir has been off the last 2 weeks and this week we had to work, work and work to get things back on track. We have had Revit Specialists in pretty much everyday of the week.
26/06/2015
posted Friday 26, 2015, 10:22 AM by Elliott Sheerin
This week has been short because i have been on a trip to malham.
22/06/2015
posted Tuesday 22, 2015, 11:41AM by Elliott Sheerin
The week before the holiday I wasn't in Wednesday and Friday. On the Tuesday we did Revit on our own projects.
24/04/2015
posted Friday 24, 2015, 10:20 AM by Elliott Sheerin
This week has been busy. We have entered a competition called The Vision Hope School, where we will have to design and engineer a school for the people in Uganda. Also this week we have had a visitor basically teaching us about the level laser, but before he came we had a tour around the school so we can write a report on the layout.
01/04/2015
posted April 01, 2015, 12:07 PM by Elliott Sheerin
This week was very short because of the easter holidays! So this week we have done more revit and tryed to catch up on website stuff.
27/003/2015
posted March 27, 2015, 10:19 AM by Elliott Sheerin
This week we had a visit by Mott MacDonald and he talked about opportunities. Also we carried on with revit and are website. I changed my website so it looked neat and tidy. My old site was on google sites but it was too untidy and really confusing!
06/02/2015
posted Feb 6, 2015, 1:57 AM by Elliott Sheerin
Well this week was alright, but the QS has failed to turn up, so we had to fill in with Revit and do three floor plans. We are doing 3 floor plans because we are going to see the positives and negatives for all of them! I also had a couple of problems this week with Revit because i couldn't do what i wanted, so i had to change the design around slightly, but it turned good in the end! I have loads of space and a very nice glass window. I need to but windows and doors to the plans
23/01/2015
posted Jan 23, 2015, 2:11 AM by Elliott Sheerin
Well this week we didnt do much because we are STILL waiting for a QS! But while we are i have made a bubble diagram to show how things are going to flow around the place and where rooms are going to be located! Also i have done anything i have forgot to do like finish the stake holders!
16/01/2015
posted Jan 16, 2015, 2:11 AM by Elliott Sheerin
This weeks we have been doing a lot of revit and doing a bit out of the workbook, we cant do to much because we need a quantity surveyor. also we have scraped a websites but not that much!
12/12/14
posted Dec 12, 2014, 2:22 AM by Elliott Sheerin
This week i did a survey and finished up my site by adding a letter to my website. In the last couple lessons we have got a model of a house and measured it ti find how long it is in meters, we did 25cm as a meter. Then we launched up revit and copied the information on to revit.
Sustainability 17/10/14
posted Oct 22, 2014, 4:06 AM by Elliott Sheerin
This week i created a suitability page with my animation on it and information on how to be sustainable. I have had discussions with my teacher about sustainability. we have found many resources like videos, pieces of text
posted Friday 01, 2016, 2:43 PM by Elliott Sheerin
This week I have been really busy
9/10/2015
posted Friday 09, 2015, 3:07 PM by Elliott Sheerin.
This week has been quite good. We have had a Building Services Engineer, which helped us do anything to do with heating, water, electricity. We have also had open evening where we looked around the school for different courses and there is a Level 3 engineering course which I am putting in consideration.
2/10/2015
posted Friday 02, 2015, 14:43 PM by Elliott Sheerin
This week we have done mostly course work, but because of the extension of the competition we only dedicated one lesson to the competition. We have accelerated through the Revit models and website work. Next week i won't to get my building mostly done because I am falling behind on it.
25/09/2015
posted Friday 25, 2015, 14:50 PM by Elliott Sheerin
This week has been active on the course work because some of us are behind and need to catch up... I need to catch up on the Revit side of stuff, e.g. Do the furniture and finish the roof and stuff. Also we have been doing some of the competition, but the good news is that the dead line has been moved up to February because the dead line before was too short to do all the stuff we need.
10/07/2015
posted Friday 10, 2015, 10:04 AM by Elliott Sheerin
its been a stress full week getting back on track! Sir has been off the last 2 weeks and this week we had to work, work and work to get things back on track. We have had Revit Specialists in pretty much everyday of the week.
26/06/2015
posted Friday 26, 2015, 10:22 AM by Elliott Sheerin
This week has been short because i have been on a trip to malham.
22/06/2015
posted Tuesday 22, 2015, 11:41AM by Elliott Sheerin
The week before the holiday I wasn't in Wednesday and Friday. On the Tuesday we did Revit on our own projects.
24/04/2015
posted Friday 24, 2015, 10:20 AM by Elliott Sheerin
This week has been busy. We have entered a competition called The Vision Hope School, where we will have to design and engineer a school for the people in Uganda. Also this week we have had a visitor basically teaching us about the level laser, but before he came we had a tour around the school so we can write a report on the layout.
01/04/2015
posted April 01, 2015, 12:07 PM by Elliott Sheerin
This week was very short because of the easter holidays! So this week we have done more revit and tryed to catch up on website stuff.
27/003/2015
posted March 27, 2015, 10:19 AM by Elliott Sheerin
This week we had a visit by Mott MacDonald and he talked about opportunities. Also we carried on with revit and are website. I changed my website so it looked neat and tidy. My old site was on google sites but it was too untidy and really confusing!
06/02/2015
posted Feb 6, 2015, 1:57 AM by Elliott Sheerin
Well this week was alright, but the QS has failed to turn up, so we had to fill in with Revit and do three floor plans. We are doing 3 floor plans because we are going to see the positives and negatives for all of them! I also had a couple of problems this week with Revit because i couldn't do what i wanted, so i had to change the design around slightly, but it turned good in the end! I have loads of space and a very nice glass window. I need to but windows and doors to the plans
23/01/2015
posted Jan 23, 2015, 2:11 AM by Elliott Sheerin
Well this week we didnt do much because we are STILL waiting for a QS! But while we are i have made a bubble diagram to show how things are going to flow around the place and where rooms are going to be located! Also i have done anything i have forgot to do like finish the stake holders!
16/01/2015
posted Jan 16, 2015, 2:11 AM by Elliott Sheerin
This weeks we have been doing a lot of revit and doing a bit out of the workbook, we cant do to much because we need a quantity surveyor. also we have scraped a websites but not that much!
12/12/14
posted Dec 12, 2014, 2:22 AM by Elliott Sheerin
This week i did a survey and finished up my site by adding a letter to my website. In the last couple lessons we have got a model of a house and measured it ti find how long it is in meters, we did 25cm as a meter. Then we launched up revit and copied the information on to revit.
Sustainability 17/10/14
posted Oct 22, 2014, 4:06 AM by Elliott Sheerin
This week i created a suitability page with my animation on it and information on how to be sustainable. I have had discussions with my teacher about sustainability. we have found many resources like videos, pieces of text